p.cole
30th May 2007, 17:41
We're using ERP LN FP3 and would like to put configured items onto estimate lines. Using the Estimate Lines session we can add a generic item, and be asked to configure the product variant options immediately, however the returned cost and sales prices are always zero.
We'd like the system to calculate the cost price to use on the estimate line based on the configured BOM and routing as per PCS projects. Is this possible?
What can be achieved by using the generic items be used within estimate lines?
We'd like the system to calculate the cost price to use on the estimate line based on the configured BOM and routing as per PCS projects. Is this possible?
What can be achieved by using the generic items be used within estimate lines?