robertopiero
3rd December 2002, 05:03
Hi everyone.
I'm currently on BAAN IV using the "Maintain Production Orders" session (TISFC0101m000) and I need to change the "delivery date" to a later date on a released production order, using "Forward" planning. Problem is, it won't let me. Is there a flag that needs to be set.? I can do the changes by going into the "Maintain Production Planning" session and changing the date on the last operation, but that's a real pain.
Thanks
Robert
I'm currently on BAAN IV using the "Maintain Production Orders" session (TISFC0101m000) and I need to change the "delivery date" to a later date on a released production order, using "Forward" planning. Problem is, it won't let me. Is there a flag that needs to be set.? I can do the changes by going into the "Maintain Production Planning" session and changing the date on the last operation, but that's a real pain.
Thanks
Robert