4th September 2002, 13:02
Hi...
Supose that i have a item that is produced in an diecast operation. This item is an group of 2 or many differents parts.
Imagine a plastic kit of plane construction....
Each of this different parts has new operations (cutting and trimming) and origin new itens (itens "www" and "zzz".
Ex : Item "xxx" is produced by diecast operation. The Bom os this item is simple: 1 un "xxx" uses 0,500Kg of alluminium....
How can i create the Bom“s of the itens "zzz" and "www" ?
The itens "zzz" and "www" has differents and i need to control them....
Thanks
Paiva
Supose that i have a item that is produced in an diecast operation. This item is an group of 2 or many differents parts.
Imagine a plastic kit of plane construction....
Each of this different parts has new operations (cutting and trimming) and origin new itens (itens "www" and "zzz".
Ex : Item "xxx" is produced by diecast operation. The Bom os this item is simple: 1 un "xxx" uses 0,500Kg of alluminium....
How can i create the Bom“s of the itens "zzz" and "www" ?
The itens "zzz" and "www" has differents and i need to control them....
Thanks
Paiva