12th August 2002, 19:57
I am faced with a scenario where a certain machine produces more scrap on high speed then it does on lower speeds.
The speed of the machine is depending on the quantity to be produced. The larger the quantity, the higher the speed.
I want to include this variable scrap-factor, to keep costs accurate, but I can't seem to do it in Baan.
Has anybody beat this challenge before?