trying to see how the system is working as far as the calculate cost of the project session is concerned.
What we have is a project that has 2 production orders
The first one is closed with no delivered quantity. If we run the actual costs by production order, we have 2042.99 as material cost
The second one is still active with a delivered quantity of 13500. If we run the actual costs by production order, we have 5793.91 as material cost
When we ran tipcs3250m000, it created a PCS/Act.Cost of goods sold of 27,580,365.00
It looks like it took the delivered quantity of the second production order and multiplied it by the actual cost of the first one.
Could it be because the second production order is still active?
i do not have the source code for tipcs3250m000 so i can't look in the script to understand the logic. Can anyboby explain to me what tipcs3250m000 does?
Or better yet, can anybody send me the script of tipcs3250m000 (in a notepad format).
We're on BaanIV c4
Regards.
PB
trying to see how the system is working as far as the calculate cost of the project session is concerned.
What we have is a project that has 2 production orders
The first one is closed with no delivered quantity. If we run the actual costs by production order, we have 2042.99 as material cost
The second one is still active with a delivered quantity of 13500. If we run the actual costs by production order, we have 5793.91 as material cost
When we ran tipcs3250m000, it created a PCS/Act.Cost of goods sold of 27,580,365.00
It looks like it took the delivered quantity of the second production order and multiplied it by the actual cost of the first one.
Could it be because the second production order is still active?
i do not have the source code for tipcs3250m000 so i can't look in the script to understand the logic. Can anyboby explain to me what tipcs3250m000 does?
Or better yet, can anybody send me the script of tipcs3250m000 (in a notepad format).
We're on BaanIV c4
Regards.
PB