19th April 2010, 12:47
Hi,

I need the component to get allocated/ issued to the operation after 50% of the oeration is completed. i.e if the cycle time is 10 hours, the material to be issued after 5 hours from the start of the operation.
I have set the lead time offset in the BOM to 5 hours, but still the material allocation is at the start of the operation.

How to set the lead time offset?

I am using ERP LN

Thanks,

Mani