quelle
26th January 2010, 08:31
Hi.
Im very frustated with this costing issue.
Im using actual costing in SFC Parameter in FP3.
After I issue material and post hour like usual.
I run report order complete 100 pcs , and answer no to message (Automatic Confirm )
Then i do partial confirm receipt.
When i see production receipt amount it shows wrong value (not equal with total material and operation cost which has been posted before)
Has anyone experience this problem?
Thanks in advance.
Im very frustated with this costing issue.
Im using actual costing in SFC Parameter in FP3.
After I issue material and post hour like usual.
I run report order complete 100 pcs , and answer no to message (Automatic Confirm )
Then i do partial confirm receipt.
When i see production receipt amount it shows wrong value (not equal with total material and operation cost which has been posted before)
Has anyone experience this problem?
Thanks in advance.