san1997
28th June 2009, 12:23
Dear experts,
Can anyone tell me is it possible to do followings through baan(ERPLN)
1).Can we integrate a Manpower Schedule which already prepared manually?
2).Can we do something with the Equipment and Utensils planning in baan?
Thanks
San
Can anyone tell me is it possible to do followings through baan(ERPLN)
1).Can we integrate a Manpower Schedule which already prepared manually?
2).Can we do something with the Equipment and Utensils planning in baan?
Thanks
San