Hello Guys,
Always I am puzzled by the backflush shortage issue in the BaaN system,why there is no switch to control the receipt of production order when we have shortage after reporting the order and backflush the materails(actually it's not the real shortage).
Is there any suggestion functionally or tech to stop the order receiving when the shortages happen?
Thanks very much!
Always I am puzzled by the backflush shortage issue in the BaaN system,why there is no switch to control the receipt of production order when we have shortage after reporting the order and backflush the materails(actually it's not the real shortage).
Is there any suggestion functionally or tech to stop the order receiving when the shortages happen?
Thanks very much!