:confused:Hi
We r using LN 6.1 FP2, As We have 6 differend shop floors named PLA1,PLA2....PLA6.

The out put of PLA1,PLA2 and PLA6 are used as input material of PLA3 and again the wip output of PLA3 is the input of PLA4 and PLA5 and the output of PLA4,5 are our finished goods also under revision control.

As we have make all my manufactured item via e-item with revision control, if we revised the bom of item of PLA1, PLA2 or PLA6 and the revision of that item is changed.

Is system change the revision of item of PLA4 and PLA5 if the revision of their input is changed.(PLA!,PLA2,PLA3,)

vik.patil
3rd October 2008, 07:26
Hi,
System will not change the revision of item PLA4 and PLA5. But whenever you will create production order for PLA4 and PLA5, revised BOM of PLA1, PLA2, and PLA3 considered.

yshokeen
3rd October 2008, 08:59
Hi,
System will not change the revision of item PLA4 and PLA5. But whenever you will create production order for PLA4 and PLA5, revised BOM of PLA1, PLA2, and PLA3 considered.


Hi Patil

I m also think so but i have to track the final item revision, May i do it manually?:confused: