hemant.k
8th April 2008, 12:13
1)How to convert E-item to P-item.please tell me the procedure.
2)After Completing the Production Order(i.e status of the PO is Completd than what next step)
Please give me the navigation procedure
kplbhll
8th April 2008, 15:29
follow this procedure to convert e item into p item,follow copy engineering items & e bom (engineering data management),go step as explain
1.copy engineering items to items
2.maintain e bom copy data
3.generate e bom copy data (multy-level)
4.finalize engineering data
,ask again if any problem face ,i will try to help u by my best
hemant.k
8th April 2008, 15:44
Steps Followed in Ln fp3 convert E-item to P-item.:-
1) Defined the E-Item.
2) Complete the Engineering Revision Procedure.
3) After Maintain the Relationship.
4) Than Approved By Engineering
5) Create the E-bom
6) Approved By Production
7) Copy E-item to P-item
8) Generate E-bom Copy Data
Pls guide the procedure follow is correct or not????????
kplbhll
10th April 2008, 12:17
procedure is right but i think not completed fully, hav u followed the procedure as i written, go upto finalize engineering data ( 4th stage of copy engineering data pls complete upto this stage & then tell me)
kplbhll
10th April 2008, 12:36
sorry i was telling all this for baan 4c4 , do u require it for LN 6.1
this is for baan 4c4 , not confirmed about LN 6.1 ( i hav to explore LN 6.1)