how to backflush (see the attachment). situation :
production order status: completed
main item deliveried, ordered,initial: 1
component item estimated: 1
component item subsequent delivery: 1
issue method: selected
direct process selected
main item and component item backflush if material: selected
main item and component item backflush material: selected
main item: without rounting
SFC backflushing method: interactive
causes:
report production order complete using globally complete(tisfc0206m000),
now
how to issue component item from WIP to WC if I have stock globally. I know if deselecting <backflushing> in issue method in ticst0101s000, initiate inventory issue(tisfc0207m000) works as a rang of production. However, I have to deselect one by one. Anyone has idea how to do it in a easy way.
thank you. -jim
production order status: completed
main item deliveried, ordered,initial: 1
component item estimated: 1
component item subsequent delivery: 1
issue method: selected
direct process selected
main item and component item backflush if material: selected
main item and component item backflush material: selected
main item: without rounting
SFC backflushing method: interactive
causes:
report production order complete using globally complete(tisfc0206m000),
now
how to issue component item from WIP to WC if I have stock globally. I know if deselecting <backflushing> in issue method in ticst0101s000, initiate inventory issue(tisfc0207m000) works as a rang of production. However, I have to deselect one by one. Anyone has idea how to do it in a easy way.
thank you. -jim