Hi, I have this situation
the BOM of item T looks like this :
item T : subitem 1 = U (4 pcs) warehouse CD
The routing of item T contains two different workcenter with two different shop floor warehouses
Workcenter 001 shopfloor warehouse W001
Workcenter 002 shopfloor warehouse W002
Item U has both for warehouse W001 and W002 in warehouse-item session the supply sistem set to order controlled/single
I insert a production order for item T and when I release it ERP LN changes the warehouse in estimated materials from CD to W001 and generates a transfer order from warehouse CD to warehouse W001.
In my opinion this is not right. In production order the warehouse should be change to W002 and ERP LN should generate two transfer order: one to to carry out my item from CD to W001 and one to carry out my item from W001 to W002. Where is my fault? Is there a way to set up my system in the way I hope it should work?
the BOM of item T looks like this :
item T : subitem 1 = U (4 pcs) warehouse CD
The routing of item T contains two different workcenter with two different shop floor warehouses
Workcenter 001 shopfloor warehouse W001
Workcenter 002 shopfloor warehouse W002
Item U has both for warehouse W001 and W002 in warehouse-item session the supply sistem set to order controlled/single
I insert a production order for item T and when I release it ERP LN changes the warehouse in estimated materials from CD to W001 and generates a transfer order from warehouse CD to warehouse W001.
In my opinion this is not right. In production order the warehouse should be change to W002 and ERP LN should generate two transfer order: one to to carry out my item from CD to W001 and one to carry out my item from W001 to W002. Where is my fault? Is there a way to set up my system in the way I hope it should work?