achavezf
12th February 2007, 02:21
Hi every one,
> I am using MBC fucntionallity for future changes and I have problems
> to implement it, here is the example:
>
> 1. A newly created finishedgood starts with an engineering item
> revision of " 0". With MBC (ECO) the new engineering item revision of
> " 1" is created with a future date.If now another MBC (ECO) is done
to
> this same finishedgood, the new engineering item revision becomes " 2
> " but copied from old engineering item revision " 0 " because Item
> engineering revision " 1 " is not yet effective. The changes in
> engineering item revision " 2 " do not include revision "
> 1 ".This is a problem.
>
> 2. And the other issue is that we cannot reschedule date in MBC
(ECO's
> ) in production. I mean if I schedule somethig for 31-03-2007 and for
> some production issue I want to reschedule to 15-02-2007.
> The system does not allow to do it.
>
> Thanks for your help.
>
> I am using MBC fucntionallity for future changes and I have problems
> to implement it, here is the example:
>
> 1. A newly created finishedgood starts with an engineering item
> revision of " 0". With MBC (ECO) the new engineering item revision of
> " 1" is created with a future date.If now another MBC (ECO) is done
to
> this same finishedgood, the new engineering item revision becomes " 2
> " but copied from old engineering item revision " 0 " because Item
> engineering revision " 1 " is not yet effective. The changes in
> engineering item revision " 2 " do not include revision "
> 1 ".This is a problem.
>
> 2. And the other issue is that we cannot reschedule date in MBC
(ECO's
> ) in production. I mean if I schedule somethig for 31-03-2007 and for
> some production issue I want to reschedule to 15-02-2007.
> The system does not allow to do it.
>
> Thanks for your help.
>