david7
5th January 2007, 14:12
Hi everyone,
I created a new E-Item using maintain engineering items, then I went to Maintain Engineering Item Revisions (tiedm1101m000) and added a revision with Effective Date 29-12-2006 and saved. So far so good When I click on the Release button the Effective date changes to the Baan (current) date! Can I some how change that? I don't want the effective date that I have entered to change.
I am copying data from another system and inserting it into Baan.
Thanks in Advance,
- David
I created a new E-Item using maintain engineering items, then I went to Maintain Engineering Item Revisions (tiedm1101m000) and added a revision with Effective Date 29-12-2006 and saved. So far so good When I click on the Release button the Effective date changes to the Baan (current) date! Can I some how change that? I don't want the effective date that I have entered to change.
I am copying data from another system and inserting it into Baan.
Thanks in Advance,
- David