We have a product that can contain different material. For example: the product is A.
A can be made by using item B with routing 10: Assembling Process
A can also be made by using item C with routing 20: COS Process.
B contain : X, Y, Z
C contain : P, Q, X, Z
Our problem is:
When we create production order product A with routing 10: Assembling process. We have to change QTY needed for C = 0 pcs in BOM. And than calculate it.
If we want to produce product A routing 20: COS Process that contain child item C. We have to change QTY needed for B = 0 pcs.
My question is:
We will input QTY B and C = 1 pcs in BOM.
How to set the linking of Routing and BOM?
if we choose routing 10 when create production order means that we will produce product A with child item B, and chose routing 20 with child item C.
Please help me about this flexiblity.
Thank you very much.
Best Regards,
Sigit
I have problem in Module Shop Floor Control.
We used BaaN 5.0c serveice pack 14.
We have a product that can contain different material. For example: the product is A.
A can be made by using item B with routing 10: Assembling Process
A can also be made by using item C with routing 20: COS Process.
B contain : X, Y, Z
C contain : P, Q, X, Z
Our problem is:
When we create production order product A with routing 10: Assembling process. We have to change QTY needed for C = 0 pcs in BOM. And than calculate it.
If we want to produce product A routing 20: COS Process that contain child item C. We have to change QTY needed for B = 0 pcs.
My question is:
We will input QTY B and C = 1 pcs in BOM.
How to set the linking of Routing and BOM?
if we choose routing 10 when create production order means that we will produce product A with child item B, and chose routing 20 with child item C.
Please help me about this flexiblity.
Thank you very much.