NicoleR
14th April 2005, 06:33
I have a subassembly item with the following item master set-ups:
manufactured
not revision contolled
phantom no
effective date is blank
MRP item
BOM level code is 3 (and I have checked for loops and recalculated the low level code)
Effective date on BOM is correct
For some reason the MRP is not generating for this item. There are open shop floor orders for this subassembly item (planned receipts). After the regen MRP is run (with no error report) - the Display Stock Movement shows that an MRP net change is still required.
This item has demand (planned requirements) for an item at BOM level 2. These are open shop floor orders. However, on the Display Stock Movement screen for the subassembly - the demand shop floor orders (planned requirements) as well as the shop floor orders for the manufacture of this subassembly (planned receipts)are not visible. There are MRP material requirements - but no planned material receipts. It is as if Baan is not running the MRP on this item at all.
Any suggestions?
Thanks
Nicole
manufactured
not revision contolled
phantom no
effective date is blank
MRP item
BOM level code is 3 (and I have checked for loops and recalculated the low level code)
Effective date on BOM is correct
For some reason the MRP is not generating for this item. There are open shop floor orders for this subassembly item (planned receipts). After the regen MRP is run (with no error report) - the Display Stock Movement shows that an MRP net change is still required.
This item has demand (planned requirements) for an item at BOM level 2. These are open shop floor orders. However, on the Display Stock Movement screen for the subassembly - the demand shop floor orders (planned requirements) as well as the shop floor orders for the manufacture of this subassembly (planned receipts)are not visible. There are MRP material requirements - but no planned material receipts. It is as if Baan is not running the MRP on this item at all.
Any suggestions?
Thanks
Nicole