Hi Friends,

Baan Vc

I have a doubt related to calculation of scrap.

I have an item X whose BOM unit is 1000 square meters.

I have item Y - 69.0184 kgs
and item Z - 69.0184 kgs

the above two items are the raw materials in the BOM.

I have a routing for this item in which I have 2 operations A & B.

In operation A I have defined scrap quantity as 1
and for B scrap quantity as 2.

I have not defined MR relations.

When I make a production order, the estimated materials come as 69.2255 for A and 69.2255 for B.

As per the formula, I think it should come as 70.0184 for A and 71.0184 for B. Am I right? or is there some other way for the calculation?

Any help will be highly appreciated.

Flip_J
7th April 2005, 18:10
I assume the material is linked to operation 0.
0.0690184 needed for 1 final item
0.2070552 for scrap of 3
69.0184 + 0.2070552 = 69.2254552

riazsayeed
9th April 2005, 08:13
Thanks Flip. The concept is clear now.