Dudutal97
21st March 2005, 15:06
We have some assemblies that we often manufacture in house and often manufacture in subcontracting (it depends on our in-house work load).
The raw materials are in the BOM so when manufcturing in-house the costing is ok.
The problem is when going to sub-contracting, the supplier buys some of the raw material by himself and charge us. Since those raw materials components are still in the BOM (we need that information for in-house manufacturing) the costing take them into considerations 2 times.
Is there a way that I can point Baan to take some components out of the costing of BOM on demand?
The raw materials are in the BOM so when manufcturing in-house the costing is ok.
The problem is when going to sub-contracting, the supplier buys some of the raw material by himself and charge us. Since those raw materials components are still in the BOM (we need that information for in-house manufacturing) the costing take them into considerations 2 times.
Is there a way that I can point Baan to take some components out of the costing of BOM on demand?