Does anyone have any ideas on how I can manufacture and purchase the same Item without using purchase orders..
I want our MPS to create a production order for the manufactured Item as well as purchase the item from an outside source, based on the whatever?? Perhaps the % in the purchase contract.

Currently the item is set up as a MPS manufactured Item.

WE are manually entering a purchase schedule for this item for a supplier, however, since the purchase schedule is not a "fixed" order, the system does not recoginze this when running MRP or MPS and we still have the original requirement to build, and are purchasing materials for the full requirement instead of the split.
Any info will be great

Tim Fleming
13th October 2004, 21:00
I don't know how locked you are on part numbers, but I seem to recall doing something similar for a client. The base part number was 1234 then added a P for the Purchased Item, and Part number 1234 we added an M for the manufactured part.

Standard costs were established for both individually, then Order Parameters set, and we made them alternate and interchangable on the BOM's.

Accounting was satisfied with the cost issue, and planning although they had to do some mental manipulation knew exactly what was on order and the status of each purchased and or manufactured.

I hope this helps you

Regards


Tim Fleming
Baan Practice Manager
e-Ventus Corporation

ltannous
15th October 2004, 07:02
So what is the BOM??
How does the demand get to both items??

dmcgrath
15th October 2004, 13:42
No need to have two seperate items.

The item should be a Purchased MPS item.
Create a Sales Contract for the item
Create a Purchase Contract for the item
Create MPS Plan Item data for the item
If you now create a sales schedule for the item and then run MPS, a Purchase Schedule will be created for the item.

ltannous
15th October 2004, 23:09
We have this set up but the item is manufacutred MPS.
Will purchase / MPS create purchase schedules and production orders??

ltannous
16th October 2004, 06:33
The set up for Purchased MPS item,does not work. It only creates purchase schedule demand, no production orders.
I set the contract to 50%, hoping that the other 50% will create production plan, bu no luck. Only schedules were created