I'd like to know the reason of this kind of situation.
I have a production order with 3 phases; the first and the second are backflushed while the last phase is not. I' like to use tihra1101m000 to insert hours for the last phase and to complete the order. When I try to process the hours (I've indicate that the last phase is completed) the system gives me the message that previous operation (the second) is not yet completed and so it doen't go on. What I'm wondering is that why if I to something like that from the tisfc0102m000 or tisfc0202m000 it doesn't gives problems (and the system works as I espected) while in the case I've shown it seems to be not correct.
I'd like to know the reason of this kind of situation.
I have a production order with 3 phases; the first and the second are backflushed while the last phase is not. I' like to use tihra1101m000 to insert hours for the last phase and to complete the order. When I try to process the hours (I've indicate that the last phase is completed) the system gives me the message that previous operation (the second) is not yet completed and so it doen't go on. What I'm wondering is that why if I to something like that from the tisfc0102m000 or tisfc0202m000 it doesn't gives problems (and the system works as I espected) while in the case I've shown it seems to be not correct.