jpadilla
14th July 2003, 23:46
I have a productio order where Material and operation costs are the same (estimated vs actual), but a surcharge that is a percent of the costs is giving estimated (negative) and actual is correct (the real percent of the total costs).
does anybodyknow what could be wrong??
Thanks
JP