neokortexx
28th May 2006, 05:09
Hi all,
I have to schedule BaaN ERP 5 jobs on TNG unicenter.
BaaN is installed on a Unix system with an Oracle database.
TNG succesfully starts the BaaN Job, but when this job fails, it never returns a return code, so the status of the tng job is always OK ( = COMPLETE).
Where in BaaN can I manage return code, as well, TNG could trap them.
Thanks.
I have to schedule BaaN ERP 5 jobs on TNG unicenter.
BaaN is installed on a Unix system with an Oracle database.
TNG succesfully starts the BaaN Job, but when this job fails, it never returns a return code, so the status of the tng job is always OK ( = COMPLETE).
Where in BaaN can I manage return code, as well, TNG could trap them.
Thanks.