baan_cap
16th July 2008, 16:44
Hi

In ERP Ln6.1 FP2, Can any body help me on the - WIP Item concept in subcontracting and its significance. (session -tcibd9137m00l) . Is it mandatory use it. As far as I know we need a Manufactured , Subcontracting and purchase (optional) type of items, in what scenario is this WIP Item used.

Thanks A Lot In Advance

pinkey
11th September 2008, 09:18
hii

When we choose WIP item,tht item is blocked for transaction ,which signal will be given in Indian localization parametr-subcontracting
We can select this item in session WIP item(tisfc9136m00l) when our raw material is not direct item but a wip,i.e in process item.