kamran
18th September 2002, 17:18
I am trying to finalise a integration batch but get the error message "Background Process not yet completed" even after running invoke background process.
Could anyone tell me the tables I need to look at to find the cause of the problem as the last think I want to do is change the status in Gld102 of the background indicator! as it will not tell me what caused the problem.
thanks
Kam
Could anyone tell me the tables I need to look at to find the cause of the problem as the last think I want to do is change the status in Gld102 of the background indicator! as it will not tell me what caused the problem.
thanks
Kam