AWondergem
8th July 2004, 14:46
What exactly is the Project (PCS) / General Result posting (Baan V).
We get loads of these postings but they don't make any sense. A sample project using one production order, zero cost materials. Estimated project cost = 0. Added some ops and changed labour rate.
Postings to WIP:
issue 0, receipt 0
operation cost 200
price variance 650
efficiency variance -100
add calc off variance -750
That leaves zero WIP on the production order. Why do I get 200 PCS general result :mad: and where should it be posted :confused: ?