Kotharu Narayan
26th June 2003, 10:13
Hi All,
PCS module implemented. When posting integration transactions Purchase/Material Cost system throws error "Invalid dimension". Required settings for the dimension done in tfgld0110m000, tfgld0109m000, tfgld4121m000, for the elements in tfgld4126m000 and for the project in tipcs8150m000. WIP a/c has dimension project mandatory. When I look into tfgld4510m000 for the particular project and order, system shows the correct posting to the ledger a/c wherein dimension is also posted but the status still shows erroneous.
What could be the problem?????
Anybody having documentation on PCS. Will be of great help.
Tks.
Narayan
PCS module implemented. When posting integration transactions Purchase/Material Cost system throws error "Invalid dimension". Required settings for the dimension done in tfgld0110m000, tfgld0109m000, tfgld4121m000, for the elements in tfgld4126m000 and for the project in tipcs8150m000. WIP a/c has dimension project mandatory. When I look into tfgld4510m000 for the particular project and order, system shows the correct posting to the ledger a/c wherein dimension is also posted but the status still shows erroneous.
What could be the problem?????
Anybody having documentation on PCS. Will be of great help.
Tks.
Narayan