27th August 2010, 14:16
Hi

I am simulating safety stock and reorder point calculation through
calculate demand forecast (whina2202m000)

I have kept order interval and all lead times (including safety time ) as 0
The Period is kept as 1 week .

I have taken following screenshot of the simulation by issuing 1 qty
and then run the demand forecast . the result is attached
i have done this till order qty 4 and taken the screenshot

the result is showing the demad forecast correct .
but the safety stock calculation and reorder point calculation are
not matching with thef ormula given in the help

can any one please help me out for analysing the result
also if anyone have any pdf regarding this please send me at helloakshay1@gmail.com

please analyse and send me the comments how system calculates these 2 fields in the report.. ( period length)

Regards
Akshay