Gigaman
3rd August 2006, 06:23
Our production procedure is,
(1) Create production order
(2) Move all raw materials from each raw material warehouse to WIP warehouse
(3) Report production order complete and backflush all materials from WIP warehouse.
We focus on the second step, and find we always need to add all raw materials into warehouse transfer order lines, which is a very very large workload. I remember in baan iv era, we can perform drp process and generate replenishment order containing all required materials demanding from production order. But I cannot find the same or similar method in SSA ERP LN system.
Every baan experts, do you meet the same situation as mine? Could you share some experience to me? Thank you.
(1) Create production order
(2) Move all raw materials from each raw material warehouse to WIP warehouse
(3) Report production order complete and backflush all materials from WIP warehouse.
We focus on the second step, and find we always need to add all raw materials into warehouse transfer order lines, which is a very very large workload. I remember in baan iv era, we can perform drp process and generate replenishment order containing all required materials demanding from production order. But I cannot find the same or similar method in SSA ERP LN system.
Every baan experts, do you meet the same situation as mine? Could you share some experience to me? Thank you.